RAC Construction Access Map


RAC Addition and Renovation Project
Steve Rees,
RAC Project Shepherd
110 Administrative Office Complex
The State University of New York at Fredonia
Fredonia, NY 14063
Ph: (716) 673-3208
Ph: (716) 366-0505

This map with the accompanying legend shows the changes made in how you may access the Rockefeller Arts Center by motor vehicle or by foot for the duration of the construction and renovation project. Varsity Drive (Letter A) will be closed to traffic at the Mason Hall loading dock. When opened, motor vehicles will be able to use the newly built access road (Letter C) to get to the Lot #11 (Steele Hall) and Lot #27. Pedestrians may use the temporary walkway (Letter D) to get from Lots #11 and #27 to the plaza area of Rockefeller Arts Center. Additional 24/7 handicap parking spaces are provided around Symphony Circle. There will be no foot traffic allowed between the RAC and Mason Hall from Maytum Hall to Varsity Drive.

RAC Construction Access


Page modified 7/23/14