SUNY Fredonia will receive sealed bids for project number M05673 titled Rosch Recital Hall Stage Floor Replacement until 1:00 PM local time on May 7, 2025 at the Office of Facilities Services, located at the Services Complex on the SUNY Fredonia campus, where such proposals will be publicly opened and read aloud in the conference room.
These project documents are for your company's use only and not for distribution. If another party, other than those expressly sent the project link, are interested in viewing these documents, they must contact the Facilities Planning Office at 716-673-3722 for access information. All documents are the sole property of the State University of New York.
Click on the following links to access the various components of this construction bid solicitation:
Forms / Information provided for your information:
Project Manual (w/ Technical Specifications)
Forms required to be submitted with Proposal:
SUNY Proposal (Form 7554-07) - Submit 2 originally signed copies of the SUNY Proposal Form
SUNY Bid Bond (Form 7554-10) - Submit 2 originally signed copies of the SUNY Bid Bond Form
Bidder Certifications (Form 7554-20)
2008 Wicks Reform - Subcontractor Information Form - Submit this form in a SEPARATELY SEALED ENVELOPE; Mark the front of the envelope with the name and address of the bidder, the Project Number & Title, and clearly indicate “Subcontractor Information”; Refer to the NYS Dept. of Labor Prevailing Wage Schedule for further information regarding the 2008 Wicks Law Reform requirements.
Wicks Law Requirements:
The prime bidder must submit with its bid a separate sealed list (the “2008 WICKS LAW REFORM SUBCONTRACTOR INFORMATION” Form SCI-1 – SCI-3) that names each subcontractor that the bidder will use to perform work on the contract, and the agreed-upon amount to be paid to each for the different trades. All non-awarded bidders’ sealed envelopes will be returned to them.
Any change of subcontractor(s) or agreed-upon amount(s) to be paid to each shall require the approval of the University, upon a showing presented to the University of a legitimate construction need for such change, which shall be open to public inspection. Legitimate construction need shall include, but not be limited to: (1) a change in project specifications, (2) a change in construction material costs, (3) a change to a subcontractor status as determined pursuant to paragraph (e) of subdivision two of section 222 of the labor law, or (4) the subcontractor has become otherwise unwilling, unable, or unavailable to perform the subcontract.
For contracts that do not involve any or all of the trade classifications listed on the form, complete and submit the form as indicated above and note “Not Applicable” (“N/A”) for the applicable trade(s). For contracts that do not involve any subcontracted work in these trades, identify each applicable trade(s) with “None”.
MWBE Program Utilization Plan (Form 7557-107) - Must be submitted within 7 days of the bid opening (For projects over $100K)
SDVOB Program Utilization Plan (Form 7564-107) - Must be submitted within 7 days of the bid opening (For projects over $100K)